Skip to content
HaltonHillsIQHalton
Service guide

GO train in Halton Hills

Halton Hills' two GO train stations on the Kitchener line, Georgetown GO and Acton GO: where they are, parking, the timetable, and the track work Metrolinx has planned.

Every answer sourcedAdministered by Metrolinx, which runs GO Transit. Every answer below was checked against its source on November 26, 2026; the source is linked under each one.

The short answer

Halton Hills has two GO train stations on the Kitchener line: Georgetown GO at 55 Queen Street, with 648 free parking spaces, and Acton GO on Mill Street, with 46. Metrolinx says the line between Kitchener GO and Georgetown GO is a single track shared with freight trains, and that more service will be added in stages as track work is finished; it gives no date for two-way, all-day service. GO's Kitchener timetable dated November 28, 2026 is the one in effect.

Last verified

From 6 official sources, administered by Metrolinx, which runs GO Transit.

The stations

2 questions
  1. Where is Georgetown GO Station, and is parking free?

    Georgetown GO is at 55 Queen Street, Georgetown, and is served by GO trains and buses. GO lists free customer parking with 223 spaces in the North Lot and 425 in the Main Lot, 648 in all, plus reserved parking, carpool parking and bike racks. The station is staffed Monday to Friday from 5:20 to 11 a.m. and unstaffed on weekends and holidays.

    Address
    55 Queen Street, Georgetown
    Free parking
    North Lot 223 spaces, Main Lot 425 spaces
    Staffed
    Monday to Friday, 5:20 to 11 a.m.

    Watch for: GO's page names VIA Rail as the station's only other rail or transit connection. It does not give the cost of reserved parking.

    Source: Metrolinx, Georgetown GO: Station Details (GO Transit)

  2. Where is Acton GO Station, and is parking free?

    Acton GO is on Mill Street in Acton; GO's page gives no street number. It is served by GO trains and buses, with free customer parking in a 46-space Main Lot and bike racks. The station is not staffed, and GO lists no local transit connections there; its nearby GO bus stops are on Mill Street East at Fellows Street.

    Location
    Mill Street, Acton
    Free parking
    Main Lot, 46 spaces
    Staffed
    No

    Source: Metrolinx, Acton GO: Station Details (GO Transit)

Service and timetable

3 questions
  1. Which GO line serves Halton Hills, and is there all-day service?

    Both stations are on the Kitchener line. Metrolinx says the line between Kitchener GO and Georgetown GO is a single active track where GO trains share space with freight traffic, and its Kitchener Extension work is meant to allow more trains in both directions. It says additional GO service will be introduced incrementally as construction advances and key segments are completed, and it gives no date for two-way, all-day service.

    Watch for: Metrolinx projects the finished work will cut a trip between Kitchener and Union Station from 111 minutes to 98 minutes. Its April 14, 2026 notice added two weekday counter-peak express trains between Kitchener GO and Union Station from April 27, without saying where they stop.

    Source: Metrolinx, Kitchener Extension

  2. Where do I find the GO timetable for Georgetown and Acton?

    GO's Kitchener timetable, Table 31, covers the line's trains together with GO Bus routes 30, 31 and 33, runs daily, and lists Acton and Georgetown among its stops. The edition effective November 28, 2026 is the one GO's PDF schedules page listed when this page was last checked. Not every train stops at every station, so check the timetable or GO's Trip Planner for your trip.

    Watch for: GO's printed schedules can change; for the next trips and delays, use GO's Trip Planner and service alerts or call 1-888-438-6646.

    Source: Metrolinx, PDF Schedules (GO Transit)

  3. Are there weekend closures on the Kitchener line?

    GO's Kitchener line construction page lists planned weekend line construction on Saturday and Sunday, December 12 and 13, then on the weekends of February 6 and 7, February 27 and 28, April 17 and 18, April 24 and 25, and May 8 and 9. It does not say on that page how each weekend changes service at Georgetown or Acton, and says work may be adjusted, rescheduled or extended because of weather or other circumstances.

    Watch for: GO's construction page gives the dates without years. Check GO's service updates before travelling on those weekends.

    Source: Metrolinx, Kitchener construction notices (GO Transit)

Planned work

1 question
  1. What track work is planned near Acton and Georgetown?

    Metrolinx lists a passing track at Acton GO Station among the future phases of its Kitchener Extension, along with a storage track near Rockwood and other work further west. East of Georgetown, Metrolinx is completing a Transit and Rail Project Assessment Process for more track on the Halton Subdivision between Bramalea and Georgetown GO stations, which it says will help enable two-way, all-day GO train service with increased frequency.

    Watch for: Metrolinx held a public information centre on the Bramalea to Georgetown work on Monday, June 22, 2026 at the Gellert Community Centre. Neither page gives a construction date.

    Source: Metrolinx, Public Information Centre on Kitchener Corridor Expansion, June 2026

Official sources and contacts

6 official pages
MetrolinxGeorgetown GO: Station Details (GO Transit)The official page this guide’s first answer is checked against. The office that runs the service has the final word on a case of your own.Open gotransit.com
Who to contact

Sources

  1. MetrolinxGeorgetown GO: Station Details (GO Transit)Retrieved November 26, 2026
  2. MetrolinxActon GO: Station Details (GO Transit)Retrieved November 26, 2026
  3. MetrolinxKitchener ExtensionRetrieved November 26, 2026
  4. MetrolinxPDF Schedules (GO Transit)Retrieved November 26, 2026
  5. MetrolinxKitchener construction notices (GO Transit)Retrieved November 26, 2026
  6. MetrolinxPublic Information Centre on Kitchener Corridor Expansion, June 2026Retrieved November 26, 2026

Every answer on this page traces to one of these documents.

Last checked 6 official pages from Metrolinx